CF Palmetto Bay Studio Control Room
Construction began this week on CF Palmetto Bay's new Control Room. Hector is overseeing the project, and I know he's got some great things planned. The control room is being relocated into a storage room in the back of the worship center. (It currently resides in another building some 300'-500' away (as the wires are run).
I'm very excited about the move. This is going to be a great thing for the Media Ministry @ CF. During the transition we are simplifying a lot of the technology, and I really believe that we are heading in the right direction.
I have a small wager in place with several CF staff/volunteers. I have vocally stated that we would be in the new control room before 2008. The others (who shall remain nameless) have vocally said it would in 2008. Having construction start now, almost five months before the New Year, things are looking good for me!
HECK YES! ITS ABOUT TIME!
Posted by: Nathan | 2007.08.20 at 11:14 AM